Skip to content
Winter 2026 pilot · 30 seats · Rules
WINTER 2026 PILOT · Civil · Project-based

Structural Design with STAAD.Pro & Site Execution

A structural project track covering load basics and IS-code awareness, STAAD.Pro modelling and analysis, RCC member design and detailing, and site-execution documentation.

DURATION6 Weeks
FORMATProject-based
MODEOnline self-paced · optional sessions when published
FEE₹999 all-in
Winter 2026 pilot · schedule to be confirmed
₹999 all-inclusive
Pilot 2026
No. 01 · Week-by-week syllabus

A real sequence, not a playlist

Six numbered weeks. Every week ends in a deliverable a reviewer actually checks — plan roughly twenty focused hours per week.

Course workspace: 23 lessons · 11 reads · 6 checkpoints · 6 reviewed builds

  1. 01~20h effort

    Week 1 · Loads, Codes & Structural Reading

    • —Dead, live, wind, and seismic load literacy
    • —IS 456 and IS 1893 awareness and where to look things up
    • —Reading a structural drawing set without guessing

    Deliverable: Load calculation sheet for a small frame

  2. 02~20h effort

    Week 2 · STAAD.Pro Modelling

    • —Grids, members, supports, and releases
    • —Material and section assignment discipline
    • —Model-checking habits before any analysis run

    Deliverable: Model file with supports and sections assigned

  3. 03~20h effort

    Week 3 · Analysis & Load Combinations

    • —Load combinations and why each one exists
    • —Reading BMD, SFD, and deflection output critically
    • —Deflection and drift checks against limits

    Deliverable: Analysis report with BMD/SFD and deflection check

  4. 04~20h effort

    Week 4 · RCC Design & Detailing

    • —Beam, column, and slab design basics per IS 456
    • —Reinforcement schedules and bar-bending notes
    • —Detailing rules that survive site conditions

    Deliverable: Design sheets with reinforcement schedule

  5. 05~20h effort

    Week 5 · Execution & Site Records

    • —Shuttering, concreting, and curing checklists
    • —Measurement-book entries and cube-test logs
    • —Progress documentation a site engineer can file

    Deliverable: Site-execution file with checklists and test log

  6. 06~20h effort

    Week 6 · Final Project Review

    • —Project reflection on modelling and design decisions
    • —Completion review against the published rubric
    • —Training-completion record when requirements are met

    Deliverable: Final project submission

No. 02 · Capstone portfolio

What you actually build

No copy-paste tutorials or toy repos. Every enrolled student submits a production-grade portfolio project evaluated against an industry rubric.

Track Capstone Project

G+1 Frame Analysis, RCC Design & Execution File

Graded Submission

Structural design file: STAAD.Pro model with analysis report, RCC member design sheets with reinforcement schedule, and a site-execution file with checklists and test logs.

STAAD.ProIS 456 / 1893 awarenessBMD / SFD readingRCC detailingMeasurement book

Portfolio Deliverables Checked by Reviewers

STAAD.Pro model with supports, sections, and combinations
Analysis report with BMD/SFD and deflection checks
RCC design sheets with reinforcement schedule
Site-execution file with checklists and cube-test log
No. 03 · Review standards

Checked by named reviewers

Reviewers are named at cohort start and published with the batch. They check every submission against the rubric — passing names appear on the certificate.

  • Every submission checked against a published academic and technical rubric
  • One fair remediation attempt if a deliverable falls short of acceptance threshold
  • No certificate without passing code checks — payment never substitutes genuine review
  • Cryptographic verification QR permanently linked to your individual submission records
No. 04 · College directory

Where Civil students take this track

Matched by branch against the BEU college directory — not an affiliation claim. Academic credit is decided by each college's T&P cell, so ask your HoD to review the syllabus before you enrol.

₹999Winter 2026 pilot · schedule to be confirmed